1. The user shall carry out concrete foundation construction according to the basic data provided by our company; the equipment should be installed on the concrete foundation more than 100 mm above the ground;
2. Supporting pipes, valves, etc. shall be separately supported and shall not be fixed on tower equipment;
3. Pay attention to protect the equipment during installation to avoid damaging the body and exposed parts. When the tower flange is connected with the external flange, the correct tightening method shall be adopted, and the excessive force shall not be allowed to cause cracks in the flange. The flange gasket shall not be steel gasket, but corrosion and oil resistant rubber gasket.
4. After the equipment is installed, water is used for cyclic debugging, and there is no running, emitting, dripping, leaking, plugging and other phenomena in normal operation.
5. Please confirm the gas flow rate and medium concentration when using
If there is any change, please contact our company;
6. When using, the circulating water pump should be started for 2-3 minutes, and then the fan should be started; when stopping, the fan should be stopped for 1-2 minutes before the circulating water pump is stopped. Attention should be paid to start the pump: the pump can not be reversed, can not be idling.
7. Regularly check and maintain the water pump, valve, pipeline, nozzle and filter screen to ensure the normal operation of the equipment.
8. In order to ensure the normal operation of tower equipment, special personnel shall be responsible for the management. It is necessary to regularly check whether the fan and water pump are running normally, whether the spray pipe and air pipe are unobstructed, whether the liquid level of liquid storage tank is normal, whether the float switch of water replenishment is normal, whether the gas-liquid concentration is within the specified range, etc. if any problem is found, it shall be solved in time.
9. Check all equipment regularly every year to prevent accidents.
Source: Jiangmen environmental protection equipment http://126aaa.cn
10-09
How to maintain environmental protection equipment in Jiangmen
1. The user shall carry out the concrete foundation construction according to the basic data provided by our company; the equipment should be installed on the concrete foundation more than 100 mm above the ground; 2. The supporting pipes and valves shall be separately supported and shall not be fixed on the tower equipment; 3. Attention shall be paid to the protection of the equipment during installation, so as not to damage the machine body and exposed parts. When the tower flange is connected
10-09
Ten maintenance details of spray tower of Jiangmen Guoqi environmental protection waste gas treatment equipment
Exhaust tower, in the type of exhaust tower, is one of the exhaust towers with long service life. It can deal with almost all mixed gases, so far it is a very practical and cheap product in the treatment of mixed waste gas. It is widely used in chemical industry, light industry, printing and dyeing, medicine, pharmacy, steel, machinery manufacturing, electronics, electroplating, painting, paint and other industries. It mainly deals with tail gas such as sulfuric acid, nitric acid and hydrofurani
10-09
Common points for attention in installation of waste gas and wastewater treatment equipment in Jiangmen
1. The user shall carry out the concrete foundation construction, and the installation surface of the foundation shall be on the same horizontal plane, and the allowable error shall not be greater than 5mm. The exhaust pipe of purification tower can be fixed by derrick type, and the foot is fixed with embedded steel plate by welding or embedded bolt. Therefore, the purification tower can not be fixed in general. The matching FRP fan is generally designed as steel frame vibration damping pedestal
10-09
Analysis of waste gas treatment equipment including those five factors
Waste gas treatment equipment is also known as waste gas purification equipment. Waste gas treatment refers to the pretreatment of the waste gas produced by industrial sites and factory workshops before discharge, so as to meet the national standards for external emission of waste gas. Today we Jiangmen environmental protection equipment home for you to introduce the analysis of waste gas treatment equipment including which five factors. General waste gas treatment includes organic waste gas tre